PROJECTS  
2012 Project

Sincere IVF Center Pte Ltd

  • Electrical Installation works for Sincere IVF Centre Pte Ltd at #06-09,10 &11 Novena Specialist Centre

Jazz Lifestyle Pte Ltd

  • Proposed Linkways and Bus Shelter within existing Alexandra Hospital at MK 03-00262N 378 Alexandra Road, Singapore 159964

Global Technology Synergy Pte Ltd

  • Design & Built Cleanroom with Support Facilities such as RO (Reverse Osmosis), DI (Distilled water), PCW, PV, Waste Water Treatment, ACMV, General Exhaust, Mechanical, Hock-Up work,Electrical and Instrumentation. Turnaround and Maintenance work

North Star Engineering Pte Ltd

  • Acidic Scrubber Electrical Control System works, Electrical & Instrumentation Turnaround & Maintenance work at Seagate W3 at 121, Woodlands Ave 5

Singapore General Hospital

  • Electrical and Instrumentation Turnaround and Maintenance work

Novena Specialist Centre #06-13/14

  • Electrical and Instrumentation Turnaround and Maintenance work

Decon Engineering Contrator

  • Electrical Design and Installation works for Single Storey Factory & 4-Storey Office MV System @ Penjuru Road

Institute of Microelectronics

  • SP 1 Machine Hook-Up works for 1st Floor CR1
  • Mechanical, Hock-Up work, Electrical and Instrumentation Turnaround and Maintenance work

Vine Construction Pte Ltd

  • Electrical Installation works for DSO phase 1 Block 2 of 8 Storey Business Park at Science Park Drive