PROJECTS  
2014 Project

Veolia Water Solutions & Technologies (SEA) Pte Ltd

  • M & E Fabrication RO Skid & Site Installation works for SATS 1 WWTP at Budget Terminal
  • Fabricate and Delivery Motors Control Centre Panel for GSK 20CMH Process Water System
  • Design and Fabricate Local Control Panel with Site Wiring works of 2m3h RODI Water System for M + W Process Industrial GmbH

Institute of Microelectronics

  • Electrical Hook up for Centura AMAT Mechanies works at IME CR 1 11 Science Park Road Singapore Science Park II
  • Scubber Replacement for EPI Tool for IME CR 5 at 11 Science Park Road Singapore Science Park II
  • Electrical Power Hook-up for Producer SE Tool at IME CR1 11 Science Park Road Singapore Science Park II

HPH Engineering Pte Ltd

  • Global Switch Refurbishment & Replacement works Of PAHU on Roof Top

Heptagon Micro Optics Pte Ltd

  • Polishing Grinder Machines Hook-up works for Heptagon 1st Floor Cleanroom Polishing Area at 26, Woodlands Loop
  • Additonal Relocation Hook-up Machines works for Heptagon Level 5 Class 10K & 100K Cleanroom at 26, Woodlands Loop
  • After P.E Comment Items Additional Lightning Protection works for Heptagon Rooftop at 26, Woodlands Loop
  • Polishing Grinder Machines#2 Hook-up works for Heptagon Level 1 Cleanroom Polishing Area at 26, Woodlands Loop
  • Semi Auto Tester Machines M & E Hook-up works for Heptagon Level 3 Lab Area at 26, Woodlands Loop
  • Shutdown Switching Over existing Electrical Switch Board for Heptagon PT Replacement works at 26, Woodlands Loop
  • Limmat Hook-up Machines Works for Heptagon Level 1 Cleanroom at 26, Woodlands Loop
  • Spea Module Tester #3 & #4 Machines Raised Platform works for Heptagon 1st Floor Cleanroom at 26, Woodlands Loop
  • Isolating Transformer for Spea Module Tester #3 & #5 Machines for Heptagon Level 1 Cleanroom at 26, Woodlands Loop
  • Convert existing IQC Lab to Panda Server Room for Heptagon 1st Storey at 26, Woodlands Loop
  • Electrical Back-up System for Heptagon Level 1 Limmat Tester at 26, Woodlands Loop
  • Replacement existing Extension Plug to Permanent Power Points works for Heptagon Level 1 Cleanroom at 26, Woodlands Loop

Nepsys Technology Pte Ltd

  • Provide Tools & Manpower to Dismantle Office Setup, Partitions, Ceilings & Carpet

Debenho Pte Ltd

  • Fabrication ACMV Electrical Control Panel and Site Wiring works for CELS-NUS at Centre Comparative Medicine
  • Design And Fabricate ACMV Local Control Panel And Site Wiring Work For NUS Researh Wing Building

Chuan Engineering Pte Ltd

  • Electrical Hook-up Machines works for International Rectifier Level 2 & 3 at 1, Kaki Bukit View

Taco Asia Pacific

  • Installation of Chilled Beam System for TACO Showroom at No.8 Jalan Kilang Barat #03-04 Central Link Singapore

Biosensors Interventional Technologies Pte Ltd

  • Dismantling & Shifting works for Blk 10 Kaki Bukit Ave 1 Unit #06-01~#06-07,  #07-01~#07-04 & Roof-Top
Dismantle
Installation

  • Provide Temporary Warehouse Storage, Additional 1 Time Shifting of Carton Boxed Document

  • Dismantling,Shifting & Reinstatement works for Blk 10 Kaki Bukit Ave 1 Unit #06-01~#06-07,  #07-01~#07-04 & Roof-Top
  • Dismantling,Shifting & Reinstatement works for Blk 10 Kaki Bukit Ave 1 Unit #01-07
  • Production Lab Expansion for Biosensors Level 3 at 1 Jalan Tukang
  • Mechanical and Electrical Installation works for Biosensors Level 1 Exturtion Room at 36, Jalan Tukang
  • Auto SMS System for Biosensors Freezer Alarm at 1 Jalan Tukang
  • Civil Mechanical Electrical Installation works for Biosensors Level 1 Utilities Room at 36, Jalan Tukang

Global Switch (Property) Singapore Pte Ltd

  • Electrical Power Points Installation for New DDC Panels Clobal Switch Level 1 to Level 7

Springleaf Engineering Pte Ltd

  • 1st Phase Replacement of New Building Automation System for Heptagon 1st Storey at 26, Woodlands Loop
  • Emergency Power Supply works for Heptagon Level 1 at 26, Woodlands Loop
  • Electrical Annual Servicing works for Heptagon at 26, Woodlands Loop

Global Technology Synergy Pte Ltd

  • Limmat MP Tester#3 works for Heptagon Level 1 Cleanroom at 26, Woodlands Loop
  • Limmat MP Tester#4 & #5 works for Heptagon Level 1 Cleanroom at 26, Woodlands Loop
  • Additional Process Vacuum Pump Electrical Manual Control work for Heptagon Level 1 at 26, Woodlands Loop
  • Limmat MP Tester#6 works for Heptagon Level 1 Cleanroom at 26, Woodlands Loop

Kelington Engineering (S) Pte Ltd

  • General Exhaust Fan & Electrical with BMS Installation works for Stats Chips Pac 1B 3F At Yishun
  • General Exhaust Ducting Installation works for Stats Chips Pac 1B 3F At Yishun
  • Additional Sub Lateral & Convert existing Machine Exhaust Point works for Stats ChipsPac 1B 3F At Yishun
  • Electrical and Instrumentation Installation works for IFF at 4 Chin Bee Drive Singapore 619855