Springleaf Engineering Pte Ltd
- Electrical Annual Servicing works for Heptagon at 26, Woodlands Loop
- Annual Shutdown Mainainance Servicing for Heptagon at 26, Woodlands Loop
ESE Engineering Pte Ltd
- Supply and Fabrication Control Panel for Biogas Project at Biotech Farms INC, Philippines Banga
- Supply Fiber Optic Patch Box for Biogas Project at Biotech Farms INC, Philippines Banga
Global Technology Synergy Pte Ltd
- Street Light Replacement works for Heptagon Level 1 at 26, Woodlands Loop
Sobono Energy Pte Ltd
- Material Supply for Biogas Project at Biotech Farms INC, Philippines Banga
- Provide Supervisor for Biomass Project at Biotech Farms INC, Philippines Tantagan
- Testing & Commisioning of Fiber Optic Rings for Biogas Project at Biotech Farms INC, Philippines Banga
STATSChipPAC LTD
- Calibration & Preventive Maintenance for Particle Count R3012 at 1A3F-5F & 1B4F
City Town Pte Ltd
- PROJECT for VDL PCW with N2 Piping Installation works at Existing Cleanroom Class 10K at 2nd Storey 259 Jalan Ibrahim Singapore 629148
- A&A works to Convert Existing Store Room to Dark Room at VDL Level 02
Decon Pte Ltd
- Electrical Installation & (Additional) works for MindChamps @ Raffles Town Club
BIOSENSORS Interventional Technologies Pte Ltd
- Partition and New Chamber Hook up works at Biosensors Level 3 R&D Lab at 36, Jalan Tukang
Heptagon Micro Optics Pte Ltd
- Replacement of existing Condenser Water Pump & Cooling Tower Fan Motor Local Control Panel with Site Installation at Roof-Top 26 Woodlands Loop
|